Failure to construct or deconstruct

 

Not only design for construction can fail but also design for deconstruction can go wrong. Here is an example failure during construction for the Chiraja Colombia bridge and an example failure during deconstruction for a Danish Silo . That is why a safe design should consider the full project life-cycle including the construction and disposal next to design and operation.